Pure saline | Completion and brine filtration

        MI SWACO offers a wide range of clear brines that are injected into the well after the drilling phase is completed. These completion fluids are designed to minimize formation damage and control formation pressure.
        Our clear completion fluids are usually formulated with soluble salts to increase density. These fluids are blended to specific specifications for density, TCT (freezing point), PCT (pressure/freezing point temperature) and clarity.
        We offer a wide range of halide brines and brine mixes formulated to meet project requirements. These fluids can be used for completions, workovers or packer fluids.
        Formate is highly soluble in water and forms a dense brine without solid particles, which reduces the need for weighting agents. MI SWACO has a long history of designing formate based brine systems for a variety of global applications. The following brines and their mixtures form the basis of our latest achievements in the field of hydraulic engineering:
       These salt systems reduce potential formation damage, contain shale stabilizers to ensure shale stability and eliminate scaling problems.


Post time: May-17-2023